3 Comments
User's avatar
G ventures's avatar

The community-clinic referral model is a smart way to keep beds fed without owning every layer of care. With the 200-bed Phuket hospital opening just as international patients are delaying trips, how does the expected ramp compare to Samui's first year, and how much room do the new long-term loans leave if arrivals stay soft?

Uncovered Thai Stocks's avatar

Thanks for the questions. We don’t make forecasts, so we can’t say how Phuket’s ramp will compare, but the filings give a few reference points. Samui opened in February 2023 and, per the 1Q26 MD&A, had cleared its accumulated losses by March 2026, about three years after opening. Ao Nang had a payback period of 6.5 years and has paid dividends to the parent since 2024. At 200 beds, against 90 at Ao Nang, Phuket is a much bigger project, so it isn’t a like-for-like comparison.

On arrivals, the travel delays we mentioned hit early in 2026. International patient revenue was still up 18.3% YoY in 1H26, led by Samui. The company does name reliance on foreign patients as a risk, along with cost overruns or lower-than-expected revenue at new projects.

On funding, liabilities rose 13.2% in 1H26, mainly from long-term loans drawn down for Phuket construction. The 3Q26 results, due by mid-November, will show the balance sheet as of 30 September, about a month before Phuket opened. The first quarter with Phuket operating will be 4Q26.

G ventures's avatar

The Samui timeline is a useful anchor - three years to clear accumulated losses sets a realistic outer bound for a 200-bed Phuket. Appreciate the reference points.